← IR-3

Continuous Improvement

LOW MODERATE HIGH
1 Overlay 0 Related Controls
Graph
Export ▾

Requirements NIST SOURCE

Use qualitative and quantitative data from testing to:

Discussion (NIST Supplemental Guidance)

To help incident response activities function as intended, organizations may use metrics and evaluation criteria to assess incident response programs as part of an effort to continually improve response performance. These efforts facilitate improvement in incident response efficacy and lessen the impact of incidents.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for IR-3(3) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. qualitative data from testing are used to determine the effectiveness of incident response processes;
  2. quantitative data from testing are used to determine the effectiveness of incident response processes;
  3. qualitative data from testing are used to continuously improve incident response processes;
  4. quantitative data from testing are used to continuously improve incident response processes;
  5. qualitative data from testing are used to provide incident response measures and metrics that are accurate;
  6. quantitative data from testing are used to provide incident response measures and metrics that are accurate;
  7. qualitative data from testing are used to provide incident response measures and metrics that are consistent;
  8. quantitative data from testing are used to provide incident response measures and metrics that are consistent;
  9. qualitative data from testing are used to provide incident response measures and metrics in a reproducible format;
  10. quantitative data from testing are used to provide incident response measures and metrics in a reproducible format.

Examine

[SELECT FROM: Incident response policy; contingency planning policy; procedures addressing incident response testing; incident response testing documentation; incident response plan; business continuity plans; contingency plans; disaster recovery plans; continuity of operations plans; crisis communications plans; critical infrastructure plans; occupant emergency plans; system security plan; privacy plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with incident response testing responsibilities; organizational personnel with responsibilities for testing organizational plans related to incident response testing; organizational personnel with information security and privacy responsibilities].

Overlays

Showing the OT/ICS overlay for the parent control IR-3 — see the IR-3(3) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

Not applicable at this tier.

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (2)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (2)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for IR-3(3). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Incident response policy
  • contingency planning policy
  • incident response plan
  • system security plan
  • privacy plan

Other Records

  • procedures addressing incident response testing
  • incident response testing documentation
  • business continuity plans
  • contingency plans
  • disaster recovery plans
  • continuity of operations plans
  • crisis communications plans
  • critical infrastructure plans
  • occupant emergency plans
  • other relevant documents or records