← CP-7

Inability to Return to Primary Site

LOW MODERATE HIGH
1 Overlay 0 Related Controls
Graph
Export ▾

Requirements NIST SOURCE

Plan and prepare for circumstances that preclude returning to the primary processing site.

Discussion (NIST Supplemental Guidance)

There may be situations that preclude an organization from returning to the primary processing site such as if a natural disaster (e.g., flood or a hurricane) damaged or destroyed a facility and it was determined that rebuilding in the same location was not prudent.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for CP-7(6) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. circumstances that preclude returning to the primary processing site are planned for;
  2. circumstances that preclude returning to the primary processing site are prepared for.

Examine

[SELECT FROM: Contingency planning policy; procedures addressing alternate processing sites; contingency plan; alternate processing site; alternate processing site agreements; alternate processing site configurations; system security plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with system reconstitution responsibilities; organizational personnel with information security responsibilities].

Overlays

Showing the OT/ICS overlay for the parent control CP-7 — see the CP-7(6) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

Not applicable at this tier.

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (1) (2) (3)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (1) (2) (3) (4)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for CP-7(6). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Contingency planning policy
  • contingency plan
  • system security plan

Other Records

  • procedures addressing alternate processing sites
  • alternate processing site
  • alternate processing site agreements
  • alternate processing site configurations
  • other relevant documents or records