← CP-6

Recovery Time and Recovery Point Objectives

LOW MODERATE ✓ HIGH
1 Overlay 0 Related Controls
Graph
Export ▾

Requirements NIST SOURCE

Configure the alternate storage site to facilitate recovery operations in accordance with recovery time and recovery point objectives.

Discussion (NIST Supplemental Guidance)

Organizations establish recovery time and recovery point objectives as part of contingency planning. Configuration of the alternate storage site includes physical facilities and the systems supporting recovery operations that ensure accessibility and correct execution.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for CP-6(2) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. the alternate storage site is configured to facilitate recovery operations in accordance with recovery time objectives;
  2. the alternate storage site is configured to facilitate recovery operations in accordance with recovery point objectives.

Examine

[SELECT FROM: Contingency planning policy; procedures addressing alternate storage sites; contingency plan; alternate storage site; alternate storage site agreements; alternate storage site configurations; system security plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with contingency plan testing responsibilities; organizational personnel with responsibilities for testing related plans; organizational personnel with information security responsibilities].

Test

[SELECT FROM: Organizational processes for contingency plan testing; mechanisms supporting recovery time and point objectives].

Overlays

Showing the OT/ICS overlay for the parent control CP-6 — see the CP-6(2) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

Not applicable at this tier.

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (1) (3)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (1) (2) (3)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for CP-6(2). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Contingency planning policy
  • contingency plan
  • system security plan

Testing

  • Organizational processes for contingency plan testing
  • mechanisms supporting recovery time and point objectives

Other Records

  • procedures addressing alternate storage sites
  • alternate storage site
  • alternate storage site agreements
  • alternate storage site configurations
  • other relevant documents or records