Include a full recovery and reconstitution of the system to a known state as part of contingency plan testing.

Discussion (NIST Supplemental Guidance)

Recovery is executing contingency plan activities to restore organizational mission and business functions. Reconstitution takes place following recovery and includes activities for returning systems to fully operational states. Organizations establish a known state for systems that includes system state information for hardware, software programs, and data. Preserving system state information facilitates system restart and return to the operational mode of organizations with less disruption of mission and business processes.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for CP-4(4) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. a full recovery of the system to a known state is included as part of contingency plan testing;
  2. a full reconstitution of the system to a known state is included as part of contingency plan testing.

Examine

[SELECT FROM: Contingency planning policy; procedures addressing system recovery and reconstitution; contingency plan; contingency plan test documentation; contingency plan test results; system security plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with contingency plan testing responsibilities; organizational personnel with system recovery and reconstitution responsibilities; organizational personnel with information security responsibilities].

Test

[SELECT FROM: Organizational processes for contingency plan testing; mechanisms supporting contingency plan testing; mechanisms supporting recovery and reconstitution of the system].

Overlays

Showing the OT/ICS overlay for the parent control CP-4 — see the CP-4(4) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

  • Base control: Included (matches standard baseline)

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (1)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (1) (2)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for CP-4(4). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Contingency planning policy
  • contingency plan
  • contingency plan test documentation
  • contingency plan test results
  • system security plan

Testing

  • Organizational processes for contingency plan testing
  • mechanisms supporting contingency plan testing
  • mechanisms supporting recovery and reconstitution of the system

Other Records

  • procedures addressing system recovery and reconstitution