← CP-2

Continue Mission and Business Functions

LOW MODERATE ✓ HIGH
1 Overlay 0 Related Controls
Graph
Export ▾

Requirements NIST SOURCE

Plan for the continuance of [one of: all; essential] mission and business functions with minimal or no loss of operational continuity and sustains that continuity until full system restoration at primary processing and/or storage sites.

Discussion (NIST Supplemental Guidance)

Organizations may choose to conduct the contingency planning activities to continue mission and business functions as part of business continuity planning or business impact analyses. Primary processing and/or storage sites defined by organizations as part of contingency planning may change depending on the circumstances associated with the contingency.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for CP-2(5) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. one of the following PARAMETER VALUES is selected: {all; essential};
  2. the continuance of <CP-02(05)_ODP SELECTED PARAMETER VALUE> mission and business functions with minimal or no loss of operational continuity is planned for;
  3. continuity is sustained until full system restoration at primary processing and/or storage sites.

Examine

[SELECT FROM: Contingency planning policy; procedures addressing contingency operations for the system; contingency plan; business impact assessment; primary processing site agreements; primary storage site agreements; alternate processing site agreements; alternate storage site agreements; contingency plan test documentation; contingency plan test results; system security plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with contingency planning and plan implementation responsibilities; organizational personnel with knowledge of requirements for mission and business functions; organizational personnel with information security responsibilities].

Test

[SELECT FROM: Organizational processes for continuing missions and business functions].

Overlays

Showing the OT/ICS overlay for the parent control CP-2 — see the CP-2(5) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

  • Base control: Included (matches standard baseline)

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (1) (3) (8)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (1) (2) (3) (5) (8)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for CP-2(5). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Contingency planning policy
  • contingency plan
  • contingency plan test documentation
  • contingency plan test results
  • system security plan

Testing

  • Organizational processes for continuing missions and business functions

Other Records

  • procedures addressing contingency operations for the system
  • business impact assessment
  • primary processing site agreements
  • primary storage site agreements
  • alternate processing site agreements
  • alternate storage site agreements
  • other relevant documents or records