Conduct capacity planning so that necessary capacity for information processing, telecommunications, and environmental support exists during contingency operations.

Discussion (NIST Supplemental Guidance)

Capacity planning is needed because different threats can result in a reduction of the available processing, telecommunications, and support services intended to support essential mission and business functions. Organizations anticipate degraded operations during contingency operations and factor the degradation into capacity planning. For capacity planning, environmental support refers to any environmental factor for which the organization determines that it needs to provide support in a contingency situation, even if in a degraded state. Such determinations are based on an organizational assessment of risk, system categorization (impact level), and organizational risk tolerance.

Implementation Guidance

Engineering Interpretation

Original engineering commentary written for this explorer — not NIST source text and not authoritative guidance.

No engineering interpretation has been authored for CP-2(2) yet. This section is architected to receive it — see the Requirements and Assessment sections above for the authoritative NIST source content in the meantime.

Assessment

NIST SP 800-53A REV 5.2.0

Assessment Objectives

  1. capacity planning is conducted so that the necessary capacity exists during contingency operations for information processing;
  2. capacity planning is conducted so that the necessary capacity exists during contingency operations for telecommunications;
  3. capacity planning is conducted so that the necessary capacity exists during contingency operations for environmental support.

Examine

[SELECT FROM: Contingency planning policy; procedures addressing contingency operations for the system; contingency plan; capacity planning documents; system security plan; other relevant documents or records].

Interview

[SELECT FROM: Organizational personnel with contingency planning and plan implementation responsibilities; organizational personnel responsible for capacity planning; organizational personnel with information security responsibilities].

Overlays

Showing the OT/ICS overlay for the parent control CP-2 — see the CP-2(2) entries within each baseline below.

OT/ICS Overlay SP 800-82r3

NIST SP 800-82r3 Appendix F, Table 22. Blank baseline means the control/control enhancement is not selected in that initial OT baseline.

LOW

  • Base control: Included (matches standard baseline)

MODERATE

  • Base control: Included (matches standard baseline)
  • Included: (1) (3) (8)

HIGH

  • Base control: Included (matches standard baseline)
  • Included: (1) (2) (3) (5) (8)

STIGs & CCIs

No STIG checks or CCI mappings are currently loaded for CP-2(2). This section is architected to display, per product: STIG ID, Finding ID, Severity, Title, Description, Check, Fix, CCI, and NIST control mapping — but nothing is populated here until a real DISA STIG/CCI dataset is ingested.

Learn more about STIG/CCI integration →

Evidence

Potential Evidence — Derived

Categorized from the SP 800-53A "Examine"/"Test" artifact list above by keyword — not an authoritative NIST evidence list.

Policy

  • Contingency planning policy
  • contingency plan
  • system security plan

Other Records

  • procedures addressing contingency operations for the system
  • capacity planning documents
  • other relevant documents or records